Cooperation

Seeking Cooperation: Complete Solution for 50 m³/h Concentrated Brine Reduction and Crystallization Salt Separation — Xinjiang

Posted Oct 24, 2026140 inquiries
Post Info
Type
Cooperation
Category
Zero Liquid Discharge Complete System
Location
Xinjiang (specific plant site to be provided separately)
Valid until
Dec 23, 2026

About

Project: Water treatment system for a chemical company in Xinjiang (owner name redacted). Scope of cooperation: Zero liquid discharge brine volume reduction 50 m³/h, including pretreatment, secondary high-density clarifier, activated carbon/multi-media filtration, UF2, weak acid cation exchanger, high-efficiency RO1, high-pressure RO2, and crystallization evaporation unit. Requirements: Provide a process package and investment estimate based on feed water quality, recovery rate, and crystallized salt specifications; provide zero liquid discharge salt-separation track record, energy consumption, and chemical consumption. Notes: The system-level package budget has been merged into sub-items; no price range is set for this post. Please submit process proposals, subcontract lists, project references, and commercial quotations according to treatment capacity and effluent specifications. Delivery/implementation location: Xinjiang (specific site address to be provided separately).

Contact

email
info@geisd.com

Inquiry

Sign in to send an inquiry

Sign In

Place Order

Sign in to place an order

Sign In