OtherReclaimed Water Reuse (Non-MBR)

Shenzhen Pingshan IC Base Wastewater Reclamation Demonstration Project (Phase I, 10,000 m³/d)

Shenzhen Pingshan IC Base Wastewater Reclamation Demonstration Project (Phase I, 10,000 m³/d)
Project Info
Treatment Capacity
1 万 m³/d(一期工程)
Location
中国 广东 深圳 坪山区龙田街道,启竹二路与丹锦路交叉口西南侧
Completion
Jul 16, 2026

About

Project overview Phase I of the Pingshan IC Base wastewater reclamation demonstration project is located in Longtian Subdistrict, Pingshan District, Shenzhen, next to the district's integrated-circuit cluster. It is a dedicated industrial wastewater facility built for the IC industry, constructed by the municipal engineering company of China Railway No.4 Engineering Group for owner Shenzhen Pingshan Huanshui IC Wastewater Treatment Co. Phase I treats 10,000 m3/d, with 16,006.76 m2 of gross floor area over a 7,480.60 m2 base slab. Production structures sit in a buried box, with an administration building and gatehouse above ground; effluent is polished in a constructed wetland and reused as landscape water for the Pingshan River. Process Published accounts describe a "deep treatment + constructed wetland polishing + landscape reuse" train: fluoride-bearing wastewater from upstream IC plants is piped to an equalisation tank, treated in the buried box, and discharged to a constructed wetland; the polished water supplements the Pingshan River. This cascading "treat - polish - recharge" model is Pingshan's approach to environmental infrastructure for the IC industry, and the box layout keeps the footprint small in a land-scarce urban fringe. Construction and operation On 20 May 2025 the project completed its inlet pipeline and began receiving fluoride-bearing wastewater, marking first water. On 16 July 2026 it passed completion acceptance. Once running, it absorbs wastewater from IC companies in the district, sparing them the cost and land of building their own plants, and provides a stable ecological water source for the Pingshan River. Pingshan had already built a wastewater reclamation demonstration works and a biopharmaceutical wastewater plant; this project is the key utility for its IC cluster and an example of Shenzhen using centralised treatment plus reuse to support water-intensive advanced manufacturing. Not disclosed Phase I total investment, construction start date, unit design parameters and online effluent monitoring data have not been published; no estimates are made here. Sources 1. China.com.cn: "Pingshan wastewater reclamation project (Phase I) achieves first water, supporting local enterprises", 21 May 2025, http://szjj.china.com.cn/2025-05/21/content_43121249.html 2. Pingshan District People's Government of Shenzhen: "Pingshan IC wastewater reclamation demonstration project (Phase I) achieves first water" (source: Pingshan Water Bureau), 30 May 2025, https://www.szpsq.gov.cn/isz/iszxxgk/gzdt/content/post_12203009.html 3. The Paper: "Weekly in pictures: China Railway No.4 Engineering Group highlights (13-20 July)", 21 July 2026, https://m.thepaper.cn/newsDetail_forward_33624773 Image: buried-box construction site of the Phase I works before first water, May 2025 (under construction; image source: China.com.cn)

Technologies

  • 集成电路工业废水深度处理
  • 含氟废水预处理
  • 人工湿地生态净化
  • 尾水回用于河道景观补水
  • 地下箱体式集约布置